Illinois Urban ManualPRACTICE STANDARDRIGHT-OF-WAY DIVERSION
|
| Average Land Slope (%) | Maximum Spacing (ft) |
|---|---|
| <5 | 125 |
| 5 to 10 | 100 |
| 10 to 20 | 75 |
| 20 to 35 | 50 |
| >35 | 25 |
Grade and angle - The grade should be positive not to exceed 2%. A crossing angle of approximately 60 degrees is preferred.
Outlet - Diversions shall have stable outlets that are not subject to erosion. Site spacing may need to be adjusted for field conditions to utilize the most suitable outlet. Examples of stable outlets include practice standards ROCK OUTLET PROTECTION 910, LEVEL SPREADER 870, or TEMPORARY SEDIMENT TRAP 960.
Concentrated flows should spread over the widest possible area after release. Flows with high sediment concentrations should pass through appropriate sediment trapping practices such as IMPOUNDMENT STRUCTURE-ROUTED 842 or TEMPORARY SEDIMENT TRAP 960.
CONSIDERATIONS
Construction of access roads, power lines, pipelines, and other similar installations often requires clearing long narrow rights-of-way over sloping terrain. Disturbance and compaction promotes gully formation in these cleared strips by increasing the volume and velocity of runoff. Gully formation may be especially severe in tire tracks and ruts. To prevent gullying, runoff can often be diverted across the width of the right-of-way to undisturbed areas by using small pre-designed diversions. Give special consideration to each individual outlet area, as well as to the cumulative effect of added diversions.
Generally earthen diversions are applicable where there will be little or no construction traffic within the right-of-way. Gravel structures are more applicable to road and other rights-of-ways where vehicular traffic is anticipated.
When earthen ridges are used, at all points where the ridge or channel will be crossed by heavy equipment the diversion should be protected according to requirements of the practice standard STABILIZED CONSTRUCTION ENTRANCE 930.
PLANS AND SPECIFICATIONS
Plans and specifications for installing right-of-way diversions shall describe the requirements for applying the practice to achieve its intended purpose. At a minimum include:
All plans shall include installation, inspection, and maintenance schedules with the responsible party identified.
Standard drawing IL-600 RIGHT-OF-WAY DIVERSION PLAN may be used as the plan sheet.
OPERATION AND MAINTENANCE
Periodically inspect the right-of-way diversions for wear and after heavy rainfall for erosion damage. Remove sediment from the flow area and repair the dike. Check outlet areas and make timely repairs as needed. When permanent road drainage is established and the area above the temporary right-of-way diversions is permanently stabilized, remove the ridge and fill the channel to blend with the natural ground, and appropriately stabilize the disturbed area.
NRCS IL February 1994
|
|