Practice Selection Guide
|
PROBLEMS |
|
NAME |
CODE |
BRIEF DEFINITION |
Sheet & Rill Erosion |
Rill & Gully Erosion |
Streambank Erosion |
Stream Channel Erosion |
Toxics & Salt Reducion |
Flooding |
Increased Peak Flow |
Nutrient Pollution |
Pesticide Pollution |
Sediment Damage |
Dust Control |
Construction Road Maintenance |
Water Table Control |
Organic Pollution |
|
Urban Stormwater Wetlands |
800 |
Constructed wetland to improve stormwater quality |
|
|
|
3 |
3 |
3 |
3 |
3 |
3 |
3 |
|
|
3 |
3 |
|
Construction Road Stabilization |
806 |
Stabilize temporary roads to reduce erosion |
|
3 |
|
|
|
|
|
|
|
2 |
2 |
3 |
|
|
|
Culvert Inlet Protection |
808 |
Temporary sediment filter at culvert inlets |
|
|
|
|
|
|
|
|
|
2 |
|
|
|
|
|
Diversion |
815 |
Channel and ridge constructed to collect and divert runoff |
2 |
2 |
1 |
|
1 |
1 |
|
1 |
1 |
1 |
|
|
|
|
|
Diversion Dike |
820 |
Perimeter dike to manage and divert runoff |
2 |
2 |
1 |
|
1 |
1 |
|
1 |
1 |
1 |
|
|
|
|
|
Dust Control |
825 |
Controlling dust on construction sites and roads |
1 |
|
|
|
1 |
|
|
|
|
|
3 |
1 |
|
|
|
Erosion Blanket |
830 |
Preformed organic or inorganic erosion mat |
2 |
|
1 |
1 |
|
|
|
1 |
1 |
2 |
1 |
|
|
|
|
Filter Strip |
835 |
Vegetated filter zone to remove pollutants |
|
|
2 |
|
1 |
|
|
1 |
1 |
2 |
|
|
|
|
|
Grass-Lined Channels |
840 |
Natural or constructed channel vegetated to convey water |
|
2 |
|
2 |
|
1 |
|
1 |
1 |
1 |
|
|
1 |
|
|
Impoundment Structure-Full Flow |
841 |
Structure for collecting and storing water, debris, or
sediment |
|
3 |
|
3 |
|
2 |
2 |
2 |
2 |
2 |
|
|
2 |
|
|
Impoundment Structure-Routed |
842 |
Structure for collecting and storing water, debris, or
sediment |
|
3 |
|
3 |
|
3 |
3 |
3 |
3 |
3 |
|
|
3 |
|
|
Infiltration Trench |
847 |
Pits or trenches designed to hold water to increase
infiltration |
1 |
1 |
|
|
|
1 |
1 |
1 |
1 |
|
|
|
|
|
|
Inlet Protection-Block and Gravel |
850 |
Temporary sediment control barrier at storm drain inlet |
|
|
|
|
|
|
|
1 |
1 |
1 |
|
|
|
|
|
Inlet Protection-Excavated Drain |
855 |
Excavated area to trap sediment at storm drain inlet |
|
|
|
|
|
|
|
1 |
1 |
1 |
|
|
|
|
|
Inlet Protection-Fabric Drop |
860 |
Temporary practice to control sediment at storm drain
inlet |
|
|
|
|
|
|
|
1 |
1 |
1 |
|
|
|
|
|
Inlet Protection-Gravel & Wire Mesh |
861 |
Temporary sediment control barrier at storm drain inlet |
|
|
|
|
|
|
|
1 |
1 |
1 |
|
|
|
|
|
Inlet Protection-Sod Filter |
862 |
Sediment filter using sod around a storm drain drop inlet |
|
|
|
|
|
|
|
1 |
1 |
1 |
|
|
|
|
|
Inlet Protection-Straw Bale Barrier |
863 |
Temporary practice to control sediment at storm drain
inlet |
|
|
|
|
|
|
|
1 |
1 |
1 |
|
|
|
|
|
Land Grading |
865 |
Smoothing surface to planned grade to improve site |
2 |
2 |
|
|
|
1 |
|
1 |
1 |
1 |
|
2 |
|
|
|
Level Spreader |
870 |
Structure to spread water flow uniformly |
1 |
1 |
1 |
|
|
|
|
1 |
1 |
1 |
|
|
|
|
|
Mulching |
875 |
Placing materials to protect soil surface |
2 |
2 |
1 |
|
|
|
1 |
2 |
2 |
2 |
2 |
|
|
|
|
Permanent Vegetation |
880 |
Establishing permanent vegetative cover |
3 |
3 |
2 |
|
2 |
2 |
2 |
3 |
3 |
3 |
3 |
1 |
|
|
|
Permeable Pavement |
890 |
Pavement having interspersed sod, gravel, or sand areas |
1 |
1 |
|
|
|
1 |
1 |
1 |
1 |
|
|
|
|
|
|
Portable Sediment Tank |
895 |
Container for trapping sediment from runoff water |
|
|
|
|
|
|
|
1 |
1 |
2 |
|
|
|
|
|
Right-of-way Diversion |
900 |
Structure to control roadway erosion |
|
1 |
|
|
|
1 |
|
|
|
1 |
|
2 |
|
|
|
Rock Check Dam |
905 |
Structure to control erosion in ditch or grass swale |
|
3 |
|
|
|
|
|
|
|
2 |
|
|
|
|
|
Rock Outlet Protection |
910 |
Rocked area at outlets to reduce flow erosion |
|
2 |
|
2 |
|
|
|
|
|
1 |
|
|
|
|
|
Silt Fence |
920 |
Temporary sediment barrier of filter fabric |
2 |
2 |
|
|
|
|
|
1 |
1 |
2 |
|
|
|
|
|
Sodding |
925 |
Laying blanket of established turf to protect area |
3 |
3 |
2 |
|
1 |
2 |
2 |
3 |
3 |
3 |
3 |
1 |
|
|
|
Stabilized Construction Entrance |
930 |
Rock pad at entrance or exit to control tracking of mud to
streets |
|
|
|
|
|
|
|
|
|
1 |
|
3 |
|
|
|
Straw Bale Barrier |
935 |
Bale barrier to trap sediment from runoff |
2 |
2 |
|
|
|
|
|
1 |
1 |
2 |
|
|
|
|
|
Structural Streambank Stabilization |
940 |
Structure to control streambank erosion |
|
|
3 |
|
|
|
|
|
|
2 |
|
|
|
|
|
Subsurface Drain |
945 |
An underground water collection and transport tube |
1 |
1 |
2 |
|
2 |
1 |
2 |
1 |
1 |
1 |
|
2 |
3 |
|
|
Sump Pit |
950 |
Temporary pit to trap and filter water |
|
|
|
|
|
|
|
2 |
2 |
2 |
|
|
|
|
|
Surface Roughening |
953 |
Grooving, stair stepping, or tracking across a slope |
1 |
1 |
|
|
|
|
1 |
|
|
1 |
|
|
|
|
|
Temporary Diversion |
955 |
Temporary diversion for runoff control |
2 |
2 |
1 |
|
1 |
1 |
|
1 |
1 |
1 |
|
|
|
|
|
Temporary Sediment Trap |
960 |
Temporary ponding basin to trap sediment |
|
1 |
|
|
|
|
1 |
1 |
1 |
2 |
|
|
|
|
|
Temporary Seeding |
965 |
Planting vegetation to protect areas from erosion |
3 |
2 |
2 |
|
2 |
2 |
2 |
2 |
2 |
2 |
2 |
|
|
|
|
Temporary Slope Drain |
970 |
Short term water conveyance down a sloping area |
|
2 |
|
|
|
|
|
1 |
1 |
1 |
|
1 |
|
|
|
Temporary Stream Crossing |
975 |
Short term stream crossing for equipment |
|
|
1 |
1 |
|
|
|
|
|
|
|
2 |
|
|
|
Temporary Swale |
980 |
Temporary excavated drainageway to control runoff |
|
1 |
|
1 |
|
1 |
|
1 |
1 |
1 |
|
|
|
|
|
Topsoiling |
981 |
Adding or replacing quality soil to the surface |
2 |
1 |
|
|
2 |
1 |
1 |
1 |
1 |
1 |
|
|
|
|
|
Tree/Forest Ecosystem Preservation |
984 |
Protecting contiguous stands of trees from construction
damage |
2 |
2 |
2 |
|
|
2 |
1 |
3 |
3 |
1 |
2 |
|
1 |
|
|
Tree and Shrub Planting |
985 |
Planting trees and shrubs |
3 |
3 |
3 |
|
2 |
1 |
2 |
3 |
3 |
3 |
3 |
|
2 |
|
|
Tree Protection |
990 |
Protecting individual trees from construction damage |
1 |
1 |
1 |
|
|
1 |
1 |
1 |
1 |
1 |
1 |
|
1 |
|
|
Tree Protection-Augering |
991 |
Protecting individual trees from underground construction
damage |
1 |
1 |
1 |
|
|
1 |
1 |
1 |
1 |
1 |
1 |
|
1 |
|
|
Vegetative Streambank Stabilization |
995 |
Vegetation to control streambank erosion |
|
|
3 |
|
|
|
|
1 |
1 |
1 |
|
|
|
|
|
Well Decommissioning |
996 |
Permanent sealing of a water well, boring, or monitoring
well |
|
|
|
|
|
|
|
3 |
3 |
|
|
|
|
3 |
|
|
1 = Slight Impact
2 = Moderate Impact
3 = Significant Impact |
|
|
October 2001 |
selguide.xls |