Illinois Urban Manual
PRACTICE STANDARD
Impoundment Structure Full Flow
(no.) CODE 842
Back to
Table of Contents

(Source: Native Plant Guide for Streams and Stormwater Facilities in
Northeastern Illinois)
DEFINITION
A dam or excavation which creates an impoundment to collect and store debris,
sediment, or water.
PURPOSE
The purposes of this practice are to reduce sediment and/or debris in runoff
waters or retard flooding, to prevent damage to downstream facilities; or to
provide surface water for consumption, irrigation, wildlife habitat, recreation
or fire protection.
CONDITIONS WHERE PRACTICE APPLIES
This practice applies where sediment or debris is expected to be contained in
runoff waters and may impair the capacity of the watercourse or damage other
structures or where a surface water supply is desirable; where storage for at
least one inch of water from the contributing watershed is available and where
any embankment does not exceed the limits for class III, small dams, as defined
by the IDNR-OWR in "Rules for Construction and Maintenance of Dams" and the
landowner or other responsible party has secured necessary permits, if required,
for design and construction from IDNR-OWR and any local governmental
authorities.
CRITERIA
Investigations - sufficient investigations shall be made of the impoundment
site and borrow areas to determine the suitability of site and materials for
construction, water holding ability and structure stability. A complete analysis
of foundation and proposed fill materials shall be made when, in the opinion of
the responsible engineer, it is necessary.
Hazard/safety - structures designed under criteria found in this practice
shall fall within the class III, small dam category, defined by the IDNR-OWR as
follows: "class III. Dams located where failure has low probability for causing
loss of life, where there are no permanent structures for human habitation, or
minimum economic loss in excess of that which naturally would occur downstream
of the dam if the dam had not failed. A dam has a low probability for causing
loss of life or minimal economic loss if it is located where its failure may
cause damage to agricultural fields, timber areas, township roads, or similar
type areas where people seldom are present and where there are few structures.
This corresponds to US Army Corps of Engineers Low Hazard Potential and USDA
NRCS class a dams."
Small dams have a total impounding capacity of less than 1000 acre-feet and
dam height of less than 40 feet, where dam height is defined as "height of dam,
in feet, as measured from the natural bed of the stream or watercourse at the
downstream dam slope toe of the barrier to the top of the embankment or
barrier."
Owners of impoundment structures shall obtain all necessary permits. IDNR-OWR
permits may be required for class III, small dams where:
- The drainage area of the proposed dam is 6400 acres or more in a rural
area or 640 acres or more in an urban area, or
- The dam is 25 feet or more in height, provided that the
impounding capacity is greater than 15 acre-feet, or
- The dam has an impounding capacity of 50 acre-feet or more provided that
the dam height is greater than 6 feet.
Pool capacities - structures for the impoundment of debris or sediment shall
have a capacity equal to the volume of sediment or debris expected to be trapped
at the site during the planned useful life of the structure. That capacity may
be proportionally reduced, if periodic removal of sediment/debris is planned.
Structures that impound water for consumptive use shall have capacity as
required by local consumptive use standards.
Structures that impound water for irrigation, wildlife habitat or recreation
shall have capacity and depth adequate for the intended use.
Structures that impound water for fire protection shall have a capacity of at
least 4000 cubic feet per residence. That capacity shall exist between the inlet
to hydrant and an elevation three feet below the permanent pool elevation.
Runoff computation - total runoff amounts and peak discharges may be computed
using procedures found in NRCS Engineering Field Handbook, NRCS Engineering
Handbook, SCS TR-55 and TR-20, US Army Corps of Engineers HEC-1 or other
procedures designated by the appropriate regulatory authorities.
Principal spillways - non-permit, IDNR-OWR class III dams shall have a
principal spillway structure capable of passing the peak discharge from the
routed hydrograph from a 24-hour duration storm event of frequency specified in
Table 1 with stage at or below emergency
spillway crest.
IDNR-OWR class III, permit size dams shall have a principal spillway
structure capable of passing the peak discharge from the routed hydrograph from
a 24-hour, 25 year storm event with stage at or below the emergency spillway
crest.
Acceptable procedures for flood routing include those in Chapter 11, NRCS
Engineering Field Handbook, SCS TR-20, SCS TR-48, US Army Corps of Engineers
HEC-1 or other procedures designated by the appropriate regulatory authorities.
For structures with flood retarding as a purpose capacity of the principal
spillway shall be adequate to discharge, in 10 days or less, the floodwater
storage needed to provide the desired level of protection to the downstream
benefited area. Storage provided primarily for the purpose of reducing the
frequency of use of the emergency spillway need not be included in this 10-day
draw down limitation. The determination of capacity must be based on
consideration of the benefits that accrue to the reduction in the discharge
rate, damages that may result from prolonged storage in the retarding pool,
damages that may result from prolonged outflow, and limitations in water rights
or other legal requirements. Longer release times may be used if warranted by
downstream conditions. The discharge through gated outlets shall not be
considered in determining the emptying time of the retarding pool.
The elevation of the crest of the lowest stage of the principal spillway
shall be set at the elevation of the sediment pool. For dry dams, the riser
shall be designed to permit design discharge at the sediment pool elevation with
provisions for discharging water at lower elevations to satisfy the functional
requirements of the structure.
All parts of the principal spillway, except attached gates and trash racks,
shall have an expected service life equal to or greater than the design life of
the structure or provisions made for replacement.
The minimum diameter of the conduit used as a principal spillway shall be 10
inches.
The storage volume shall not be less than the expected sediment accumulation
during a period equal to the design life.
The retarding storage requirements shall be contain the runoff expected to
occur at a frequency consistent with the level of protection to be provided to
the downstream benefited area, with proper allowance for discharge through the
principal spillway. The retarding storage capacity shall be sufficient to limit
the use of the emergency spillway to a permissible frequency and duration based
upon consideration of the erosion resistance of the spillway material and
vegetative protection to be provided.
Principal spillway structures may be conduits, weir-type straight drops, or
chutes.
Principal spillway pipe conduits and fittings may be metal, as per NRCS
material specifications 551,
552,
553,and
554 or non-metal, as per
NRCS material specifications 541,
542,
544, or
547. Conduits of other
materials may be used at the discretion of the appropriate regulatory
authorities.
Pipe conduits should meet the following requirements:
The pipe should be capable of withstanding external loading without yielding,
buckling, or cracking. Pipe strength should not be less than that of the types
indicated in Table 2 for plastic pipe and in
Table 3 for corrugated aluminum and galvanized
steel pipe. Flexible pipe strength shall not be less than that necessary to
support the design load with maximum 5 percent deflection. The inlets and
outlets should be structurally sound and made of materials compatible with that
of the pipe. All pipe joints should be made watertight by the use of couplings
or gaskets or by welding or caulking.
Acceptable pipe materials are cast-iron, steel, corrugated steel, or
aluminum, concrete, plastic, vitrified clay with rubber gaskets, and
cast-in-place reinforced concrete. Aluminum pipe will not be used in soils with
pH values outside the range of 4-9. Concrete and vitrified clay pipe should be
laid in a concrete bedding. Plastic pipe that will be exposed to direct sunlight
should be made of ultraviolet-resistant materials and protected by coating or
shielding, or provisions for replacement should be specified. Connections of
plastic pipe to less flexible pipe or structures must be designed to avoid
stress concentrations that could rupture the plastic. Cantilever outlet
sections, if used, should be designed to withstand the cantilever load. Pipe
supports should be provided when needed. Other suitable outlet protection
structure devices may also be used to provide a safe outlet.
Anti-seep collars should be installed around the pipe conduit in the normal
saturation zone if any of the following conditions exist:
- The settled dam height exceeds 15 feet.
- The conduit is of smooth exterior pipe larger than eight
inches in diameter.
- The conduit is of corrugated exterior pipe larger than 12 inches in
diameter.
Anti-seep collars and their connections to the pipe should be watertight. The
collar material should be compatible with pipe materials. The maximum spacing
should be approximately 14 times the minimum projection of the collar measured
perpendicular to the pipe. A minimum of one anti-seep collar should be used on
all conduits.
Closed conduit spillways designed for pressure flow must have adequate
anti-vortex devices at their inlets.
If needed to prevent clogging of the conduit, an appropriate trash guard
should be installed at the inlet or riser.
For safety reasons, all vertical drop inlets should be constructed to prevent
accidental injury. This may be accomplished by using a horizontal anti-vortex
baffle, trash rack or guardrail.
Procedures for designing, dimensioning, and detailing pipe conduit spillways
may be found in the Engineering Field handbook, the NRCS National Engineering
Handbook and the Illinois Procedures and Standards for Urban Soil Erosion and
Sedimentation Control or other references specified by local regulatory
authorities.
Weir-type straight drops or box inlets and chutes shall be designed according
to procedures in the NRCS Engineering Field Handbook, the NRCS National
Engineering Handbook, and the USDA Agricultural handbook No. 301, or as
specified by the local regulatory authorities.
NRCS toe wall drop structures can be used if the vertical drop is 4 feet or
less, flows are intermittent, downstream grades are stable, and tailwater depth
at design flow is equal to or greater than one-third of the height of the
overfall.
The ratio of the capacity of drop boxes to road culverts shall be as required
by the responsible road authority. The drop box capacity attached to a new or
existing culvert must equal or exceed the culvert capacity at the design flow.
Emergency spillways - An emergency spillway must be provided for each dam,
unless the principal spillway is large enough to pass peak discharge from the
routed design hydrograph and the trash that comes to it without overtopping the
dam. The following are minimum criteria for acceptable use of pipe conduit
principal spillway without an emergency spillway: a conduit with a
cross-sectional area of 3 feet or more, an inlet that will not clog, and an
elbow designed to facilitate the passage of trash.
The minimum capacity of a natural or constructed emergency spillway shall be
that required to pass the peak flow expected from the routed hydrograph from a
design storm of the frequency and duration shown in Table 1. IDNR-OWR class III
permit dams shall have an emergency spillway capable of passing the peak
discharge from the routed hydrograph from a 100-year, 24-hour storm event less
principal spillway discharge.
Emergency spillways shall provide for passing the design flow at a safe
velocity to a point downstream where the dam will not be endangered.
Constructed emergency spillways are open channels that usually consist of an
inlet channel, a control section, and an exit channel. They shall be stable for
the material in which the spillway is to be constructed. The emergency spillway
shall have a bottom width of not less than 10 feet.
Upstream from the control section, the inlet channel shall be level for the
distance needed to protect and maintain the crest elevation of the spillway. The
inlet channel may be curved to fit existing topography. The grade of the exit
channel of a constructed emergency spillway shall fall within the range
established by discharge requirements and permissible velocities. Design
procedures and details for vegetated earth emergency spillways may be found in
the NRCS Engineering Field Handbook, the NRCS National Engineering Handbook, and
SCS Technical Release 52, or other references specified by the local regulatory
authorities.
Foundation cutoff - A cutoff of relatively impervious material shall be
provided under the dam if necessary. The cutoff shall be located at or upstream
from the centerline of the dam. It shall extend up the abutments as required and
be deep enough to extend into a relatively impervious layer or provide for a
stable dam when combined with seepage control. The cutoff trench shall have a
bottom width adequate to accommodate the equipment used for excavation,
backfill, and compaction operations. Side slopes shall not be steeper than one
horizontal to one vertical.
Seepage control - Seepage control is to be included if:
- Pervious layers are not intercepted by the cutoff,
- Seepage creates swamping downstream,
- Such control is needed to insure a stable embankment,
- Special problems require drainage for a stable dam.
Seepage may be controlled by:
- Foundation, abutment, or embankment drains,
- Reservoir blanketing,
- A combination of these measures.
Earth embankment - The minimum top width for a dam is shown in
Table 4. If the embankment top is to be used as
a public road, the minimum width shall be 16 feet for one-way traffic and 26
feet for two-way traffic. Guardrails or other safety measures shall be used
where necessary and shall meet the requirements of the responsible road
authority.
The combined upstream and downstream side slopes of the settled embankments
shall not be less than five horizontal to one vertical, and neither slope shall
be steeper than two horizontal to one vertical. All slopes must be designed to
be stable, even if flatter side slopes are required.
If needed to protect the slopes of the dam, special measures, such as berms,
rock riprap, sand-gravel, soil cement, or special vegetation, shall be provided.
The minimum elevation of the top of the settled embankment shall be 1 foot
above the water surface in the reservoir with the emergency spillway flowing at
design depth. The minimum difference in elevation between the crest of the
emergency spillway and the settled top of the dam shall be 2 feet for all dams
having more than 20 acres drainage area or more than 20 feet in effective
height.
The design height of the dam shall be increased by the amount needed to
insure that after settlement the height of the dam equals or exceeds the design
height. This increase shall not be less than 5 percent, except where detailed
soil testing and laboratory analysis show that a lesser amount is adequate.
Excavated impoundments:
Runoff - Provisions shall be made for a pipe and emergency spillway if
necessary. Runoff flow patterns shall be considered when locating the pit and
placing the spoil.
Side slopes - Side slopes of excavated ponds shall be stable and shall not be
steeper than one horizontal to one vertical.
Perimeter form - If the structures are to be used for recreation or are
highly visible to the public, the perimeter or edge should be curvilinear.
Inlet protection - If surface water enters the pond in a natural or excavated
channel, the side slope of the impoundment shall be protected against erosion.
Excavated material - The material excavated from the pond shall be placed so
that its weight will not endanger the stability of the pond side slopes and so
that it will not be washed back into the pond by rainfall. It shall be disposed
of in one of the following ways:
- Uniformly spread to a height that does not exceed 3 feet, with the top
graded to a continuous slope away from the impoundment.
- Uniformly placed or shaped reasonably well, with side slopes assuming a
natural angle of repose. The excavated material will be placed at a distance
equal to the depth of the impoundment but not less than 12 feet from the
edge of the impoundment.
- Shaped to a designed form that blends visually with the landscape
- Used for low embankment and leveling.
- Hauled away.
Vegetation - Disturbed areas that are not to be cultivated shall be
established as soon as practicable after construction. Seedbed preparation,
seeding, fertilizing and mulching shall comply with practice standards
PERMANENT VEGETATION 880 or
TEMPORARY SEEDING 965.
CONSIDERATIONS
Site safety - Impoundments are potential attractive nuisances and safety
aspects must be considered in their design and layout. If the area is used or
may be used for recreation, it is recommended that warning signs be erected,
that lifesaving equipment be available on site and that emergency instructions
be posted in a conspicuous location.
Visual resource design - The visual design of impoundments shall be carefully
considered in areas of high public visibility and those associated with
recreation. The underlying criterion for all visual design is appropriateness.
The shape and form of ponds, excavated material, and plantings are to relate
visually to their surroundings and to their function.
The embankment may be shaped to blend with the natural topography. The edge
of the impoundment may be shaped so that it is generally curvilinear rather than
rectangular. Excavated material can be shaped so that the final form is smooth,
flowing, and fitting to the adjacent landscape rather than angular geometric
mounds. If feasible, islands may be added for visual interest and to attract
wildlife.
Impoundments for water supply should have adequate drainage area to fill at
least yearly. As a minimum, drainage area, in acres, where water supply is a
primary purpose, shall equal permanent storage in acre-feet.
PLANS AND SPECIFICATIONS
Plans and specifications for installing full flow impoundment structures
shall be in keeping with this standard and shall describe the requirements for
installing the practice to achieve its intended purpose. Items that
specifications should address, if applicable, and appropriate
construction/material specifications, standard drawings and other standards are
as follows:
Site and foundation preparation - All site and foundation areas shall be
prepared and maintained in such a manner that earthfill placement or other
specified treatments allow the practice to achieve its intended purpose.
Applicable construction specifications may include:
1 CLEARING,
2 CLEARING AND GRUBBING,
8 MOBILIZATION,
10 WATER FOR CONSTRUCTION,
and 11 REMOVAL OF WATER.
Applicable material specifications may include:
521 AGGREGATES FOR DRAINFILL
FILTERS, and 592 GEOTEXTILES.
Applicable standard drawings may include drawing number
IL-515 DIVERSION PLAN,
IL-585 EARTH DAM
STRUCTURE PLAN,
IL-630 STABILIZED CONSTRUCTION ENTRANCE,
IL-650 SUMP PIT PLAN,
and IL-670 TEMPORARY
SLOPE DRAIN PLAN.
Other applicable standards may include: DIVERSION 815,
SUMP PIT 950,
TEMPORARY SLOPE DRAIN 970,
and TEMPORARY STREAM CROSSING
975.
Excavations and earthfill - All specified excavation shall be preformed and
earthfills shall be placed in such a manner that allows the practice to achieve
its intended purpose. Applicable construction specifications may include:
10 WATER FOR CONSTRUCTION,
21 EXCAVATION,
23 EARTHFILL,
24 DRAINFILL,
25 ROCKFILL,
26 SALVAGING AND SPREADING
TOPSOIL, 61 LOOSE ROCK
RIPRAP, 62 GROUTED ROCK
RIPRAP, and 95 GEOTEXTILE.
Applicable material specifications may include:
521 AGGREGATES FOR DRAINFILL AND
FILTERS, 523 ROCK FOR RIPRAP,
and 592 GEOTEXTILE.
Applicable standard drawings may include:
IL-585 EARTH DAM
STRUCTURE PLAN.
Spillway structures - All spillways including inlet and outlet structures
shall be constructed or installed in a manner that allows the practice to
achieve its intended purpose. Materials and construction techniques specified
shall be appropriate for the intended life and hazard classification of the
practice. Where available, manufacturer's installation recommendations may be
included in specifications. Applicable construction specifications may include:
24 DRAINFILL,
25 ROCKFILL,
32 CONCRETE FOR MINOR STRUCTURES,
34 STEEL REINFORCEMENT,
41 REINFORCED CONCRETE PRESSURE
PIPE PRINCIPAL SPILLWAY CONDUITS,
42 CONCRETE PIPE CONDUITS AND
DRAINS, 43 CLAY PIPE
CONDUITS, 51 CORRUGATED
METAL PIPE CONDUITS, 52
STEEL PIPE CONDUITS, 53
DUCTILE-IRON PIPE CONDUITS,
61 LOOSE ROCK RIPRAP, 62
GROUTED ROCK RIPRAP, 64 WIRE
MESH GABIONS, 71 WATER
CONTROL GATES, 81 METAL
FABRICATION AND INSTALLATION,
83 TIMBER FABRICATION &
INSTALLATION, and 95
GEOTEXTILES.
Applicable material specifications may include:
521 AGGREGATES FOR DRAINFILL and
FILTERS, 522 AGGREGATES FOR
CONCRETE, 523 ROCK FOR
RIPRAP, 531 PORTLAND CEMENT,
532 AIR ENTRAINING ADMIXTURES,
534 CURING COMPOUND,
535 PREFORMED EXPANSION JOINT
FILLER, 536 SEALING COMPOUND,
537 NON-METALLIC WATERSTOPS,
538 METAL WATERSTOPS,
539 STEEL REINFORCEMENT,
541 REINFORCED CONCRETE PRESSURE
PIPE, 542 CONCRETE CULVERT
PIPE, 544 CLAY PIPE AND CLAY
DRAIN TILE, 547 PLASTIC
(PVC, PE, ABS) PIPE, 551
METALLIC COATED CORRUGATED STEEL PIPE,
552 ALUMINUM CORRUGATED PIPE,
554 STEEL PIPE & FITTINGS,
581 METAL,
582 GALVANIZING,
584 STRUCTURAL TIMBER AND LUMBER,
585 WOOD PRESERVATIVES AND
TREATMENT, and 592
GEOTEXTILE.
Applicable standard drawings may include:
IL-543 INLET FOR
UNDERGROUND OUTLET METAL,
IL-545 CULVERT FLARED END
SECTION, IL-576
HEADWALL SAFETY GUARD FOR PIPE RISERS,
IL-577 HOOD INLET WITH
BAFFLE FOR CMP,
IL-578 CMP DROP INLET & BAFFLE, IL-579 CMP PIPE DIAPHRAGM,
IL-580 COUPLING BAND FOR
CMP, IL-581 TIMBER
PROP FOR 10" - 30" DIAMETER CMP,
IL-582 TIMBER PROP FOR
36" - 48" DIAMETER CMP,
IL-583 DROP INLET
STRUCTURE PLAN,
IL-584 HOOD INLET STRUCTURE PLAN,
IL-585 EARTH DAM
STRUCTURE PLAN,
IL-586 CMP SUPPORT,
IL-590 TRASH RACKS FOR PIPE DROP INLET,
IL-591 TRASH RACKS FOR
HOODED INLET, IL-592
DETAIL FOR PVC CANOPY INLET,
IL-593 FLEXIBLE ANTISEEP
COLLAR, and IL-610
PIPE OUTLET TO FLAT AREA.
Site physical protection plan - Adequate measure shall be specified to
control, on site, additional runoff and/or contaminants expected as a result of
construction activities; to provide for the safety of the general public; and to
provide a maintainable system of erosion protection for the constructed
practice. Applicable construction specifications may include:
6 SEEDING, SPRIGGING, & MULCHING
FOR PROTECTIVE COVER, 26
SALVAGING & SPREADING TOPSOIL,
27 DIVERSIONS AND WATERWAYS,
46 TILE DRAINS,
61 LOOSE ROCK RIPRAP,
62 GROUTED ROCK RIPRAP,
64 WIRE MESH GABIONS,
91 CHAIN LINK FENCE, and
95 GEOTEXTILES.
Applicable material specifications may include:
523 ROCK FOR RIPRAP and
592 GEOTEXTILES.
Applicable standard drawings may include:
IL-515 DIVERSION PLAN,
IL-540 WATERWAY PLAN,
IL-541 ROCK CHECKS FOR
WATERWAYS, IL-543
INLET FOR UNDERGROUND OUTLET,
IL-595 PORTABLE SEDIMENT
TANK PLAN, IL-615
SEDIMENT BASIN DEWATERING PLAN,
IL-620 SILT FENCE PLAN,
IL-630 STABILIZED
CONSTRUCTION ENTRANCE PLAN,
IL-635 STRAW BALE BARRIER
PLAN, and IL-660
TEMPORARY SEDIMENT TRAP.
Other applicable standards may include:
DIVERSION 815,
DIVERSION DIKE 820,
DUST CONTROL 825,
EROSION BLANKET 830,
FILTER STRIP 835,
LAND GRADING 865,
MULCHING 875,
PERMANENT VEGETATION 880,
PORTABLE SEDIMENT TANK 895,
ROCK OUTLET PROTECTION 910,
SILT FENCE 920,
SODDING 925,
STRAW BALE BARRIER 935,
SUBSURFACE DRAIN 945,
TEMPORARY DIVERSION 955,
TEMPORARY SEDIMENT TRAP 960,
TEMPORARY SEEDING 965,
TEMPORARY SWALE 980, and
TOPSOILING 981.
OPERATION AND MAINTENANCE
An operation and maintenance plan should be developed and concurred in by the
owners/operators of the impoundment structure. The operation plan shall
establish a schedule for testing all operable facilities to ensure that they
function as intended, or that necessary repairs are made. The maintenance plan
shall specify responsible parties for maintaining or replacing, as necessary:
all vegetative components of the structure, riprap for wave protection or outlet
protection, inlet and outlet works, safety features including fences and signs,
and on-site erosion/water control facilities.
Procedures and responsible parties for removing and disposing of accumulated
debris and/or sediment as necessary to ensure the function of the structure
shall be specified. Procedures and responsible parties for repairing damage to
embankment, spillway structures and other appurtenances shall be specified. The
structure shall be inspected at least yearly and after every storm event causing
flows through vegetated spillways or over top of embankment.
If required by the IDNR-OWR, an emergency action plan shall be filed for
permit structures.
NRCS IL August 1994
TABLE 1
Spillway Requirements for Non-Permit Dams
|
Drainage Area (Acres) |
Principal Spillway Minimum Design Storm Frequency (Years) |
Emergency Spillway Minimum Design Storm Frequency (Years) |
|
0 –100 |
5 |
25 |
|
100 – 250 |
10 |
50 |
|
> 250 |
25 |
100 |
TABLE 2
Principal Spillway - PVC Pipe for Use in Earth Dams
|
Nominal Pipe Size |
Schedule or Standard Dimension Ratio (SDR) |
Maximum Depth of Fill (ft.) |
|
4" or smaller |
Schedule 40
Schedule 80
SDR 26 |
15
20
10 |
|
6", 8", 10", 12" |
Schedule 40
Schedule 80
SDR 26 |
10
15
10 |
TABLE 3
Principle Spillway - Minimum Gauges for Corrugated Metal Pipe
|
Fill Over Pipe (ft.) |
Pipe Diameter (in.) |
Pipe Diameter (in.) |
|
12 & less |
24 |
30 |
36 |
42 |
48 |
12 & less |
24 |
30 |
36 |
Steel Minimum Gauge |
Aluminum1 Minimum Thickness (in.) |
|
1 – 15 |
16 |
16 |
16 |
14 |
12 |
10 |
.06 |
.06 |
.075 |
.075 |
|
15 – 20 |
16 |
16 |
16 |
14 |
12 |
10 |
.06 |
.06 |
.105 |
.105 |
1 Riveted or helical fabrication.
TABLE 4
Minimum Top Width for Dams
|
Total Height of Embankment (ft.) |
Top Width (ft.) |
|
10 or less |
6 |
|
10 – 15 |
8 |
|
15 – 20 |
10 |
|
20 – 25 |
12 |
|
25 – 35 |
14 |
|
35 or more |
15 |